Skip to content

HVAC, cleanroom & healthcare engineering · Ahmedabad

+91 63558 82656
Airvon
Menu

ServiceA-02.05

AMC & Energy Retrofit

Maintenance built to keep a room in its qualified state, plus audits and retrofit work on systems that are running but no longer performing.

Governed by

ISHRAE · ISO 14644-1

Engineering approach

How we work on this

The order matters more than any individual decision in it. Most of the failures we are called in to correct are sequencing failures rather than equipment failures.

  1. 01

    Maintenance that holds qualification

    A qualified room drifts out of qualification quietly: filters load, gaskets harden, dampers creep. A breakdown-only contract catches none of it, so the scope is built around scheduled filter changes on a measured basis, periodic rebalancing and a re-qualification cycle.

  2. 02

    Measure before replacing

    An energy audit starts with what the plant is actually drawing and delivering against what it was designed to. Most of the recoverable energy in an older system is in balancing, controls and filter management rather than in new equipment.

  3. 03

    Retrofit against the current requirement

    Facilities change use. A retrofit is scoped against what the rooms have to hold now, not against the drawing the building was handed over with.

Scope of workA-02.05

Everything carried under this discipline

Not a summary. If it is on this list we carry it ourselves rather than subcontracting it.

  • 05.01Preventive maintenance
  • 05.02Breakdown support
  • 05.03AHU maintenance
  • 05.04Chiller maintenance
  • 05.05VRF/VRV maintenance
  • 05.06Filter replacement
  • 05.07Energy-efficiency assessment
  • 05.08HVAC retrofit

Deliverables

What you are holding at the end

The documents that make the next stage of your project possible, and that an auditor will ask to see.

  • Preventive maintenance schedule and checklist
  • Filter change record on a measured basis
  • Periodic rebalancing report
  • Energy assessment with measured baseline
  • Retrofit scope with expected performance change

Relevant standards

What the work is designed and tested to

ISHRAE
Design and installation practice for heating, ventilation and air conditioning.
ISO 14644-1
Cleanroom classification by airborne particle count
What each standard requires

Typical applications

Where this work goes

  • Pharmaceutical facilities holding classified areas
  • Hospital OT and ICU blocks
  • Older HVAC plant with rising running cost
  • Rooms failing re-qualification

Proof

Work of this kind

Most of our work is carried out under confidentiality agreements with pharmaceutical manufacturers and hospitals, so it is not published here. Reference contacts for comparable facilities are provided on request during a tender.

Questions

What people ask us first

What does an AMC actually cover?
It depends on what the rooms have to hold. For a comfort system it is servicing and breakdown response. For a classified area it must also include scheduled filter management, rebalancing and re-qualification support, or the room will fail its next test.
Do you take over maintenance of systems you did not install?
Yes. It normally begins with an audit of the current condition and the existing documentation, so both sides know what is being taken on.
What returns most on an energy retrofit?
Usually correcting the balance, the control strategy and the filter regime before touching the plant. Replacing equipment on a system that is out of balance moves the inefficiency rather than removing it.